At 10:10 on Halloween night, LCRA's gauge on Lake Austin read 492.2 feet above mean sea level. That is 99 percent full and within the 491.8-to-492.8-foot target operating range the river authority keeps for the lake. Two months earlier, that same water was scheduled to sit about 10 feet lower right now, near 481.8 to 482.8 feet, with the shoreline along Emma Long Metropolitan Park exposed to the lakebed.
For anyone in Greenshores who treats City Park as the backyard off City Park Road, the cancellation reversed what this November looks like. The water in the lake is back to normal. The water inside the park is not. On Oct. 12, the day the drawdown would have started, the park's water utilities were shut off for scheduled maintenance, and they stay off until Jan. 15, 2027. A fall visit now depends on what you carry in with you.
How the Lake Stayed Full
The City of Austin and LCRA announced the drawdown on Aug. 20. It would have lowered Lake Austin between Mansfield Dam and Tom Miller Dam from Oct. 12 through Nov. 30 so shoreline owners and City departments could work on docks, bulkheads and boat slips. On Sept. 24, the City called it off. Its release said staff had heard concerns about the effect on businesses and activities along the lake, naming the fall wedding season, University of Texas football games and Formula 1.
KXAN reported that lakefront stakeholders had wanted the drawdown partly to remove hydrilla, an invasive underwater plant, while business owners said it would mean dozens of layoffs during their busy season. According to KXAN, LCRA offered Dec. 1 to Jan. 15 as an alternative, and the City turned it down because of holiday events on the lake. Stakeholders also floated January and February. LCRA has said that since Winter Storm Uri in 2021 it no longer schedules winter drawdowns, so the hydroelectric generators on the Highland Lakes stay available to the Texas power grid in cold weather. Assistant City Manager Mike Rogers said in the release that staff "will continue evaluating economic, operational, environmental and community considerations associated with potential future drawdowns."
Once the fall window closed and winter was ruled out, there was no time slot left in 2026. The lake simply stayed where it was.
The Park's Separate Schedule
The water project at Emma Long was never tied to the lake level. The park's alert describes it as scheduled maintenance that runs from Oct. 12, 2026, to Jan. 15, 2027. The City's closures listing for the water shutoff was updated Sept. 24, the same day the drawdown was canceled, and it kept the January end date.
Here is how the park stands in early November:
| Item | Status | Through |
|---|---|---|
| Lake Austin level | 492.2 ft msl, 99% full, as of Oct. 31 | Normal operating range |
| Park hours | Open 7 a.m. to 10 p.m. | Year-round |
| Showers, sinks, fountains, hose bibs | Shut off | Jan. 15, 2027 |
| RV dump station | Not accessible | Jan. 15, 2027 |
| Restrooms | Portable toilets for day use and camping | Jan. 15, 2027 |
| Construction noise | Possible from 8 a.m. to 6 p.m. | Jan. 15, 2027 |
The water shutoff affects the trails more than the beach. With the fountains off, there is no refilling a bottle at the trailhead, and a dog coming back muddy from a creek crossing goes into the car unrinsed. On a longer hike, carry in your water from home.
The Boat Ramp Listing
One item still reflects the August plan. The City's closures page lists Emma Long's public boat ramp as closed and swimming as prohibited from Oct. 12 through Nov. 30 "during this period" of the drawdown. That entry carries an Aug. 20 update date, which is before the cancellation. The same page still shows a matching closure at Commons Ford Ranch Metropolitan Park, farther up the lake.
Before you trailer a boat to City Park or pack for the swim beach this month, call or stop by the on-site park office, open 8 a.m. to 4 p.m. daily, and ask whether the ramp and the beach entry swimming area are open that day.
Turkey Creek With Nothing to Refill At
The Turkey Creek Trail is the part of Emma Long that the lake level never touched. The City's trail directory puts it at 2100 City Park Rd. and lists it as 1.92 miles of shared-use trail, classified as off-leash and not ADA accessible. In the rest of the park, the posted rule is that pets stay on leash and under the owner's control. A KVUE hiking roundup notes that the trail crosses the creek several times and lists no fee or reservation for hiking it.
On the other side of the park, the Emma Long Metro Park Motorcycle Trails at 7700 Oak Shores add 8.38 miles. The City's trail description calls the area an active motorcycle trail shared with mountain bikes, with a main loop of about 5 miles, a beginner loop of almost a mile, and technical terrain.
Before a creek-crossing loop this month:
- Fill water at home for each person, plus a collapsible bowl if your dog is coming.
- Keep a towel in the car, since there's no hose to rinse paws or boots afterward.
- Go before the weekend if you want quieter trails. Weekday parking costs less, and you buy the pass at the gate.
Pricing a Weekday Visit
Emma Long's fee structure makes weekdays the easy choice. Vehicle entry is $5 a day Monday through Thursday and $10 Friday through Sunday and on holidays. Walk-in or bike-in entry is $1. Monday through Thursday, drivers pay at the pay station with coins or a credit card. Cash isn't accepted. Walk-in and bike-in visitors use the pay station Monday through Wednesday and buy online Thursday through Sunday.
Weekends work differently, under the entry policies posted on the City's Emma Long page:
- Day passes for Friday through Sunday and holidays are sold online and can be bought up to 14 days ahead. Each household can buy two per day.
- The park holds 250 cars. Once it fills, no one can wait in line for a spot, and parking along the right-of-way outside the gate isn't allowed.
- There are no in-and-out privileges, so a trip home for more water ends the visit.
That third rule matters more this fall than usual. Under normal conditions you could refill at a fountain inside the park. Through Jan. 15, the only water you'll have is what you brought.
Camping Through the Shutoff
All campsite reservations are made online, up to 180 days ahead. Check-in is at 3 p.m. and check-out at 10 a.m. The Bluff primitive sites, at $10 a night, are normally served by communal water. The Grove primitive sites, also $10, are walk-in sites with no utilities. Utility sites cost $20 a night, or $25 on the waterfront, and are sold with water and electric hookups for rigs up to 32 feet. The park's alert says all water utilities and the dump station are off for the length of the project. A November or December weekend at a waterfront site now means arriving with full fresh-water tanks and leaving with your tanks still holding what you brought in, because there's nowhere to empty them.
As of the Oct. 31 reading, the lake beside those sites is within its normal range. The water shutoff ends Jan. 15, 2027. Until then, Emma Long is a full lake next to a park with no running water.
The lakefront between City Park Road and Mansfield Dam changes in small ways that rarely appear in a listing, from a drawdown that's announced and then called off to a water project that sets the park's calendar until January. When you'd like a read on how those changes affect a particular Greenshores property, DEN Property Group is glad to walk the shoreline with you. Find Your DEN.®